亚洲专区路线一路线二天美-亚洲中字幕永久在线观看-亚洲在线播放视频-亚洲在成人网在线看-精品久久人人做人人爽综合-精品久久免费视频

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!

s the solidification of atomic ash too fast? Changxing Baodi provides you with tips!


 Atomic ash (also known as unsaturated polyester putty) is an indispensable surface filling and repair material in daily industrial fields such as automobile maintenance, furniture manufacturing, and ship repair. It is widely recognized by users for its excellent filling, polishing, adhesion, and rapid curing properties. Changxing Baodi Environmental Protection Technology Co., Ltd., as a professional manufacturer of atomic ash, has always been committed to providing customers with high-quality products and practical solutions. 

Atomic ash is mainly composed of unsaturated polyester resin, fillers (such as talc powder), a small amount of additives, and supporting curing agents. Its core advantages lie in:
1. Strong filling ability: It can effectively fill defects such as dents, sand holes, and welds on substrates such as metal and wood.
2. Fast drying speed: When used in conjunction with a curing agent, it can harden in a short period of time, significantly improving work efficiency.
3. Good polishing performance: After curing, the hardness is moderate and easy to polish flat, providing a good foundation for subsequent spraying.
4. Excellent adhesion: It has good adhesion to substrates such as metal and wood that have been properly treated.
5. High stability: High quality atomic ash has low shrinkage rate and is not easy to crack or fall off.
Today, Changxing Baodi Environmental Protection Technology Co., Ltd., a manufacturer of atomic ash, received a call from a user asking: What should I do if the atomic ash dries too quickly? Let me explain briefly below
The rapid drying of atomic ash can be solved by adjusting the mixing method, controlling the proportion of curing agent, and optimizing the construction environment. The main reasons include excessive curing agent, high ambient temperature, or excessive mixing amount. Targeted measures such as small and multiple mixing, appropriate reduction of curing agent addition ratio (not exceeding the lower limit), and lowering construction temperature need to be taken. ‌‌‌‌
Adjust the allocation method and proportion
Small amount and multiple blending: calculate the single dosage according to the gel time of the putty, so as to avoid too much one-time blending that will lead to curing before use up. It is recommended to control the amount of each blending within 5-10 minutes. ‌‌‌‌
Reasonably control the proportion of curing agent:
Within the recommended curing agent ratio range by the manufacturer (usually 1.5% -3%), reduce the amount added appropriately to slow down the drying speed, but ensure that it is not lower than the minimum ratio requirement to avoid not drying. ‌‌
Attention: Excessive curing agent is one of the main reasons for rapid drying, and it is necessary to strictly follow the instructions for proportioning.
Optimize the construction environment
Temperature control: High temperature will accelerate the solidification of atomic ash. It is recommended to carry out construction in an environment of 15-25 ℃, avoiding direct sunlight or using heating equipment. ‌‌‌‌
Thin scraping treatment: Adopting a layered thin scraping method, with each layer thickness not exceeding 3mm, shortening the single construction time and reducing the risk of rapid local curing. ‌‌
Other auxiliary measures
Choose slow drying products: If the conventional atomic ash drying speed is too fast, it can be replaced with slow drying models or customized products. ‌‌
Pre treatment of board: Ensure that the construction surface is free of oil and water stains, and avoid accelerated drying caused by abnormal reaction between atomic ash and substrate due to pollution.
The atomic ash produced by Changxing Baodi Environmental Protection Technology Co., Ltd. strictly controls the quality of raw materials and production processes to ensure stable and reliable product performance. We understand that every detail in construction is related to the final outcome. If you encounter the problem of rapid solidification of atomic ash, please do not worry and refer to the above suggestions for adjustment. If the problem persists or you have any questions about product selection, please feel free to contact Changxing Baodi's technical service team at any time. We will wholeheartedly provide you with professional technical support and solutions.
Choose Changxing Baodi Atomic Ash for an efficient and reliable surface repair experience!
Kind reminder: Please refer to the product manual of Changxing Baodi Atomic Ash that you are using for specific operations. Please wear protective equipment during construction to ensure safe operation.


Prev:No data!
NextAnalysis of Atomic Ash Shaping Technology

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 羞羞网站免费观看 | 久久国产精品亚洲一区二区 | 被免费网站在线视频 | 亚洲欧美国产一区二区三区 | 羞羞视频网 | 一区二区三区福利 | 激情五色天 | 久久久久国产成人精品亚洲午夜 | 波多野 在线 | 久久精品最新免费国产成人 | 羞羞在线观看 | 亚洲视频在线免费播放 | 九九亚洲精品 | 欧美αv日韩αv亚洲αv在线观看 | 欧美精品自拍 | 欧美第一页在线 | 亚洲视频欧美 | 五月天激情丁香 | 亚洲精品视频在线观看免费 | 亚洲精品视频在线观看你懂的 | 亚洲毛片免费看 | 日韩免费在线观看视频 | 国产精品视屏 | a级日本高清免费看 | 亚洲免费视频在线 | 亚洲视频精品在线观看 | 波多野结衣资源在线 | 久久综合九色综合欧洲 | 日本不卡不码高清免费观看 | 最新激情网站 | 亚洲国产精品一区二区第四页 | 亚洲一区二区三区免费视频 | 色婷婷色综合激情国产日韩 | 亚洲国产精品一区二区第四页 | 日韩毛片视频 | 亚洲国产成人资源在线桃色 | 最近中文版字幕在线观看 | 自拍偷拍网址 | 最新qvod电影| 国色天香社区在线观看免费直播 | 激情五月播播 |